Difference between revisions of "JLEIC Impedance"
From CASA Wiki
(→Meeting Presentations) |
(→2019-11-11) |
||
(27 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
== Meeting Presentations == | == Meeting Presentations == | ||
+ | |||
+ | |||
+ | === 2019-11-11 === | ||
+ | |||
+ | |||
+ | <UL> | ||
+ | <li>Mark Wiseman and Chuck Hutton [http://casa.jlab.org/MEIC%20meeting/impedance/2019-11-11/19%5F11%5F11%20JLEIC%20Bellows%20%2Epptx RF Shielded Bellows for JLEIC]</li> | ||
+ | </li> | ||
+ | <li>Frank Marhauser [http://casa.jlab.org/MEIC%20meeting/impedance/2019-11-11/2019%5FBellows%2Epdf Shielded and unshielded bellows - A brief review, and some numerical analysis for so-called low-impedance bellows]</li> | ||
+ | </li> | ||
+ | </UL> | ||
+ | |||
+ | === 2019-08-20 === | ||
+ | |||
+ | |||
+ | <UL> | ||
+ | <li>Dan Wang [http://casa.jlab.org/MEIC%20meeting/impedance/2019-08-20/JLEIC%20meeting%5Ftalk%2D1%2Epdf The broad-band impedance budget in the accumulator ring of ALS-U project]</li> | ||
+ | </li> | ||
+ | </UL> | ||
=== 2019-07-16 === | === 2019-07-16 === | ||
− | + | <UL> | |
+ | <li>Tim Michalski [http://casa.jlab.org/MEIC%20meeting/impedance/2019-07-16/Impedance%20Meeting%20-%20Status%20and%20Outlook%20on%20Engineering%20Design%20-%2020190716%20TJM%20Rev%201.pptx Status and Outlook on Engineering Design]</li> | ||
+ | </li> | ||
+ | </UL> | ||
=== 2019-06-17 === | === 2019-06-17 === | ||
− | + | <UL> | |
− | + | <li>Rui Li [http://casa.jlab.org/MEIC%20meeting/impedance/2019-06-17/multibunch%20spectra%20analysis%2Epdf Multibunch spectral analysis for uneven bunch fill]</li> | |
+ | </li> | ||
+ | </UL> | ||
=== 2019-05-14 === | === 2019-05-14 === | ||
− | + | <UL> | |
− | + | <li>Frank Marhauser [http://casa.jlab.org/MEIC%20meeting/impedance/2019-05-14/2019-05_14_May_Status_IR_Chamber%2Epdf Status of IR chamber impedance analyses]</li> | |
− | + | <li>Gunn Tae Park [http://casa.jlab.org/MEIC%20meeting/impedance/2019-05-14/impedance_meeting%2Epdf Beam loading study of harmonic kicker]</li> | |
+ | </UL> | ||
=== 2019-04-22 === | === 2019-04-22 === | ||
− | + | <UL> | |
+ | <li>Rui Li [http://casa.jlab.org/MEIC%20meeting/impedance/2019-04-22/2019-04-22-Diffraction%20Model%2Epdf Overview of diffraction model of broadband impedance for RF cavities]</li> | ||
+ | </li> | ||
+ | </UL> | ||
=== 2019-03-25 === | === 2019-03-25 === | ||
− | + | <UL> | |
− | + | <li>HyeKyoung Park [http://casa.jlab.org/MEIC%20meeting/impedance/2019-03-25/Imp%20mtg%2020190325%2Epptx The wakefield study results of crab cavity]</li> | |
+ | <li>Rui Li [http://casa.jlab.org/MEIC%20meeting/impedance/2019-03-25/impedance%20summary%203%2D25%2D19%2Epptx Summary of broadband and narrowband impedance studies for JLEIC]</li> | ||
+ | </UL> | ||
=== 2019-2-22 === | === 2019-2-22 === | ||
− | + | <UL> | |
− | + | <li>Shaoheng Wang [http://casa.jlab.org/MEIC%20meeting/impedance/2019-02-22/2019_02_22_LCBI%20Impedance%20Threshold%20in%20Ion%20Ring.pdf Narrow Band Impedance Threshold for Longitudinal Coupled Bunch Instability]</li> | |
+ | <li>Frank Marhauser [http://casa.jlab.org/MEIC%20meeting/impedance/2019-02-22/2019%5F02%5F22%20JLEIC%20impedance%20status%2Epptx JLEIC impedance status]</li> | ||
+ | </UL> | ||
=== 2018-12-10 === | === 2018-12-10 === |
Latest revision as of 14:05, 14 November 2019
Contents
Meeting Presentations
2019-11-11
- Mark Wiseman and Chuck Hutton RF Shielded Bellows for JLEIC
- Frank Marhauser Shielded and unshielded bellows - A brief review, and some numerical analysis for so-called low-impedance bellows
2019-08-20
2019-07-16
- Tim Michalski Status and Outlook on Engineering Design
2019-06-17
2019-05-14
- Frank Marhauser Status of IR chamber impedance analyses
- Gunn Tae Park Beam loading study of harmonic kicker
2019-04-22
2019-03-25
- HyeKyoung Park The wakefield study results of crab cavity
- Rui Li Summary of broadband and narrowband impedance studies for JLEIC
2019-2-22
- Shaoheng Wang Narrow Band Impedance Threshold for Longitudinal Coupled Bunch Instability
- Frank Marhauser JLEIC impedance status
2018-12-10
- Frank Marhauser Impedance Status
- Vasiliy Morozov Status of IR Design and Collimators
- Rui Li Discussion of JLEIC Impedance Priorities
2018-08-02
- Kirsten Deitrick Ion Ring Broadband Impedance (Collision)
- Rui Li Coupled Bunch Instability (CBI) in JLEIC
- Frank Marhauser Progress on the Design of the JLEIC Ion Ring Cavities (JLAB-TN-18-041)
2018-06-25
- Shaoheng Wang Cavity Longitudinal Impedance Thresholds Determination for Coupled Bunch Instability
- Kirsten Deitrick Kickers and Update on Broadband Impedance
- Rui Li Longitudinal Coupled Bunch Instability for the Ion Ring
- HyeKyoung Park Update on Crab Cavity HOMs
2018-05-14
- Shaoheng Wang Impedance Calculation for Interaction Region in Colliders
- Rui Li Impedance Study at IPAC18
2018-03-19
- Kirsten Deitrick Broadband Longitudinal Impedance Estimates
2018-03-02 (IR Chamber)
- Frank Marhauser Impedances in the EIC IR Chamber
2018-02-19
- HyeKyoung Park Crab Cavity Updates
- Salvador Sosa Power from Longitudinal Crab Cavity HOMs
- Mark Wiseman IR Bellows Requirement
- Rui Li Impedance Thresholds from the Instability Estimations
2017-12-04
- Rui Li Discussion on Concepts of Wakefield and Impedance
- Suba De Silva HOM and Impedance Analysis for Crabbing Cavity System
Relevant R&D Presentations
- Rui Li Ion Effects in the JLEIC Electron Collider Ring (2018-03-15)
- Rui Li Detailed Studies of Longitudinal Coupled Bunch Instabilities in JLEIC (2017-07-20)
- Rui Li Instabilities and Collective Effects (2017-06-08)
- Rui Li Status of Instability Estimation for JLEIC (2017-03-23)
- Rui Li JLEIC Collective Effects (2017-02-23)
- Rui Li Discussion of Impedance Budget (2017-02-09)
- Older presentations exist, see MEIC R&D Meeting webpage
Other Links
- Impedance Budgets and Estimates Spreadsheet
- Part counts, impedance values from other machines, JLab simulation results, estimates, references
- Everyone can add simulation results - email Kirsten (kdeit001@odu.edu) if you have questions