PITMinutes 09-10-2015

From CASA Wiki
Revision as of 09:22, 14 September 2015 by Krafft (Talk | contribs)

Jump to: navigation, search

Attendance

S. Cooper, A. Freyberger, R. Geng, G. Krafft, F. Marhauser, T. Powers, J. Preble, T. Reilly, C. Reece, H. Wang

Agenda and Notes

1. Operations Status and Summary

After recovery, 1 Module exposed to air look pretty much the same from gradient point of view.

Other exposed modules being cooled down.

Cryo on schedule for transition on Sept. 21 to two plant OPS.

4 C100s in north and 1 in injector will not be He processed. Problems uncovered in He processing C100s need to be understood. Presentations made to SRF science and analysis meeting.

2. Comments/New Appointment (Reilly)

3. C75 Project Summary Document (Krafft, Freyberger)

4. SRF Budgeting for C50, C75, and R&D (Reilly, Geng)

Rongli working through requests for new account. Will be less that 150k anticipated last week.

5. C75 Power Curves (Krafft)

Action Items

Complete Project Summary Document; Project Leader (Freyberg, Rimmer, Krafft)