Difference between revisions of "PITMinutes 09-14-2015"

From CASA Wiki
Jump to: navigation, search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
S. Cooper, A. Freyberger, R. Geng, G. Krafft, F. Marhauser, T. Powers, J. Preble, T. Reilly, C. Reece, H. Wang
+
R. Bachimanchi, S. Cooper, A. Freyberger, R. Geng, C. Hovater, G. Krafft, F. Marhauser, C. Mounts, T. Powers, T. Plawski, J. Preble, T. Reilly, R. Rimmer, H. Wang
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
After recovery, 1 Module exposed to air look pretty much the same
+
4 modules which have seen air are now cool. NL12 and 13 haven't been cold yet.
from gradient point of view.
+
SL5 and 6 have been recovered and processed. A team has been formed
 +
to to find out how air got in. Check vacuum procedures in warm regions.
  
Other exposed modules being cooled down.
+
He processing terminates this week. PSS checkout afterward.
  
Cryo on schedule for transition on Sept. 21 to two plant OPS.
+
Startup currently October 26.
  
4 C100s in north and 1 in injector will not be He processed.
+
Plant 2 has contmination that needs to be found and
Problems uncovered in He processing C100s need to be understood.
+
elliminated. Further warm-ups and cool downs will be
Presentations made to SRF science and analysis meeting.
+
required.  
 +
 
 +
RF soak starts Oct. 12.
 +
 
 +
Individual cavity heaters in R100 have been implemented
 +
and testing to see if can get better performance started.
 +
 
 +
Investigation team for heat and He pressure in R100.
 +
Better instrumentation? (Tiefenback, Daly, and Mounts)
 +
Experiment to measure limits?
  
 
2. Comments/New Appointment (Reilly)
 
2. Comments/New Appointment (Reilly)
Line 39: Line 49:
  
 
Complete Project Charter Document; Project Leader (Freyberg, Rimmer, Krafft, Hutton)
 
Complete Project Charter Document; Project Leader (Freyberg, Rimmer, Krafft, Hutton)
 +
 +
Data mining for field emission (Geng)
 +
 +
C75 parameter table! (krafft, rimmer, marhauser)

Latest revision as of 16:42, 25 September 2015

Attendance

R. Bachimanchi, S. Cooper, A. Freyberger, R. Geng, C. Hovater, G. Krafft, F. Marhauser, C. Mounts, T. Powers, T. Plawski, J. Preble, T. Reilly, R. Rimmer, H. Wang

Agenda and Notes

1. Operations Status and Summary

4 modules which have seen air are now cool. NL12 and 13 haven't been cold yet. SL5 and 6 have been recovered and processed. A team has been formed to to find out how air got in. Check vacuum procedures in warm regions.

He processing terminates this week. PSS checkout afterward.

Startup currently October 26.

Plant 2 has contmination that needs to be found and elliminated. Further warm-ups and cool downs will be required.

RF soak starts Oct. 12.

Individual cavity heaters in R100 have been implemented and testing to see if can get better performance started.

Investigation team for heat and He pressure in R100. Better instrumentation? (Tiefenback, Daly, and Mounts) Experiment to measure limits?

2. Comments/New Appointment (Reilly)

3. C75 Project Summary Document (Krafft, Freyberger)

4. SRF Budgeting for C50, C75, and R&D (Reilly, Geng)

Rongli working through requests for new account. Will be less that 150k anticipated last week.

5. C75 Power Curves (Krafft)

Action Items

Complete Project Charter Document; Project Leader (Freyberg, Rimmer, Krafft, Hutton)

Data mining for field emission (Geng)

C75 parameter table! (krafft, rimmer, marhauser)