Model Team Jan 13 2015
From CASA Wiki
Presents
Alicia Hofler, Theo Larrieu, Rui Li, Yves Roblin, Todd Satogata, Dennis Turner, He Zhang
Agenda
- Preparation for Feb 13th restart
- Current decks status/CED status
- Hall B model for upcoming run
- Inclusion of 5th pass separation
- Allsave/CED crosscheck tool
- Tesplans review
- Which were done and report
- What is left to do and prioritize it
- Mid to long term model development
- Cebaf linac cavity modeling status report
- Integrate injector model with CEBAF model
- Dogleg focussing studies. Does it have to be included in model ?
- Develop procedure to crosscheck measured body gradient with machine.
- Feature requests for operational tools (EDT,elegant,etc..)
- EDT to have support for loading alternate optics via SDDS
- qSUtility to support zigzag scans
- Inclusion of multipole in model. Where is it needed ?
- Study of effect of orbits in spreader/recombiner on
- First and second order dispersion terms
- Linac accelerating profiles loaded into model
- Evaluate effect on focussing and need to rematch at spreader
---