PITMinutes 12-08-2014

From CASA Wiki
Revision as of 10:03, 9 December 2014 by Krafft (Talk | contribs)

Jump to: navigation, search

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, A. Freyberger, G. Krafft, F. Marhauser, R. Norton, C. Mounts, T. Plawski, J. Preble, R. Rimmer, S. Suhring

Agenda and Notes

  1. Operations Status and Summary

Bellows observed to be rusted in 2L25. Suggested that all bellows in similarly constructed CMs be inspected. Also, any useful post mortem on the rusted below? E. Daly will pursue.


  1. LR PIT Wiki

Access through CASA Wikis or https://casa.jlab.org/wiki/index.php/Long_Range_LINAC_Performance_Integration

Choose Long Range LINAC Performance Integration link

  1. Updated Distribution List


Documents and Presentations

Action Items

Link To long range schedule (Krafft)

Links to achieved and needed gradient reports (Freyberger)

Belows Investigation (Daly)