Ops Working Group Minutes 2015-03-30
From CASA Wiki
Revision as of 10:08, 31 March 2015 by Freyberg (Talk | contribs) (New page: 1 RF Long Range PIT Operations Working group: Meeting 1 :ATTACH: ======================================================== <2015-03-30 Mon 9:30> 1.1 Attachments ~~~~~~~~~~~~~~~...)
1 RF Long Range PIT Operations Working group: Meeting 1 :ATTACH:
============================================
<2015-03-30 Mon 9:30>
1.1 Attachments
14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)
The following files are attached to the zimbra meeting announcement (zimbra authenticate in web browser before clicking): + [FSD reduction study: 3-month summary] + [PIT Themes]
+ [FSD reduction study: 3-month summary | https://zimbra.jlab.org/service/home/~/?auth=co&id=389395-389394&part=2&disp=a ]
+ [PIT Themes | https://zimbra.jlab.org/service/home/~/?auth=co&id=389395-389394&part=3&disp=a ]
1.2 Attendance
14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)Freyberg 14:08, 31 March 2015 (UTC)
+ Plawski, Benesch, Cooper, Mounts, Michaud, Carpenter, He Zhang
1.3 Notes
14:08, 31 March 2015 (UTC)Freyberg 14:08, 31 March 2015 (UTC)
+ Review of the 2011 FSD note, see attached. + 2011 FSD note manually included the C100 data, there was only one zone at the time. + Need to incorporate C100 FSD data into the same FSD data flow as for the C25/C50 modules. + Analysis requires lots of interpretation, it this, then it was that; if this and this then it was that. Rather messy. + C100 trip recover is now less than 2mins.
1.4 TODO [0/3] Actions
14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)Freyberg
- 1.4.1 TODO Develop high level milestones and goals
DEADLINE: <2015-04-13 Mon> Who: Arne Deliverable: Presentation at the [2015-04-15 Wed] meeting
- 1.4.2 TODO Resurrect R code for trip analysis of C20/C50
DEADLINE: <2015-04-15 Wed> Who: Adam Deliverable: Presentation/report at the [2015-04-15 Wed]
- 1.4.3 TODO Develop a plan to incorporate C100 fault data into existing tools
Who: Clyde, Plawski, Cooper, Rama? Deliverable: give a verbal status update at the [2015-04-15 Wed] meeting.
1.5 Thoughts
14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)~~
- 1.5.1 Operations Working group themes (slide 3 of Geoff's presentation)
+ Operations and Operations Processes - LEM Improvement - Operations Emax changes and process - Cryo Load/Capacity reconciliation and enhanced diagnostics. "Better" pressure diagnostics. - Improvements in heater controls + Trip Rates and Trip Rate Reduction - Understanding spontaneous arcing and rapid loss of gradient - Microphonics damping - rework or re-positioning of module presently in 0L04 (R100) - LLRF upgrades, particularly for C50s
- 1.5.2 Comments
Most of the first meeting dealt with RF trips and how the data in collected and interpreted. This subject is likely to play a major role for this working group.