Ops Working Group Minutes 2015-03-30

From CASA Wiki
Jump to: navigation, search

1 RF Long Range PIT Operations Working group: Meeting 1  :ATTACH:

============================================
 <2015-03-30 Mon 9:30>


1.1 Attachments 14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)

 The following files are attached to the zimbra meeting announcement
 (zimbra authenticate in web browser before clicking):
 + [FSD reduction study: 3-month summary]   https://zimbra.jlab.org/service/home/~/?auth=co&id=389395-389394&part=2&disp=a
 + [PIT Themes] https://zimbra.jlab.org/service/home/~/?auth=co&id=389395-389394&part=3&disp=a

1.2 Attendance 14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)Freyberg 14:08, 31 March 2015 (UTC)

 + Plawski, Benesch, Cooper, Mounts, Michaud, Carpenter, He Zhang


1.3 Notes 14:08, 31 March 2015 (UTC)Freyberg 14:08, 31 March 2015 (UTC)

 + Review of the 2011 FSD note, see attached.
 + 2011 FSD note manually included the C100 data, there was only one
   zone at the time.
 + Need to incorporate C100 FSD data into the same FSD data flow as for
   the C25/C50 modules.
 + Analysis requires lots of interpretation, it this, then it was that;
   if this and this then it was that.  Rather messy.
 + C100 trip recover is now less than 2mins.


1.4 TODO [0/3] Actions 14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)Freyberg

  • 1.4.1 TODO Develop high level milestones and goals
 DEADLINE: <2015-04-13 Mon>
 Who: Arne
 Deliverable: Presentation at the [2015-04-15 Wed] meeting


  • 1.4.2 TODO Resurrect R code for trip analysis of C20/C50
 DEADLINE: <2015-04-15 Wed>
 Who: Adam
 Deliverable: Presentation/report at the [2015-04-15 Wed]


  • 1.4.3 TODO Develop a plan to incorporate C100 fault data into existing tools
 Who: Clyde, Plawski, Cooper, Rama?
 Deliverable: give a verbal status update at the [2015-04-15 Wed]
                                   meeting.


1.5 Thoughts 14:08, 31 March 2015 (UTC)14:08, 31 March 2015 (UTC)~~

  • 1.5.1 Operations Working group themes (slide 3 of Geoff's presentation)
 + Operations and Operations Processes
   - LEM Improvement
   - Operations Emax changes and process
   - Cryo Load/Capacity reconciliation and enhanced diagnostics.
     "Better" pressure diagnostics.
   - Improvements in heater controls
 + Trip Rates and Trip Rate Reduction
   - Understanding spontaneous arcing and rapid loss of gradient
   - Microphonics damping
   - rework or re-positioning of module presently in 0L04 (R100)
   - LLRF upgrades, particularly for C50s


  • 1.5.2 Comments
 Most of the first meeting dealt with RF trips and how the data in
 collected and interpreted.  This subject is likely to play a major
 role for this working group.