Attendance

R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, L. King, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, A. Seryi, and S. Suhring.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Operations over the past two weeks have been relatively quite. The energy has been scaled back to 1000 GeV in NLINAC and 1020 GeV in SLINAC.


2. Cryomodule Shuffle Planning (Freyberg)

There have been several meetings where cryomodule shuffles for the summer have been planned out with the goal to get energy margin back, especially in the north linac. Attached are various presentations


Energy Reach Brainstorming Meeting

Energy Reach Options A,B,C

Additional Options D,E False Quenches and Other Topics False Quenches and Other Topics

3. Investigation of "Quench" Faults (Powers)

Many indicated quench faults are not real quenches because the field energy leaves the cavities to quickly. Some preliminary investigations


False Quenches and Other Topics

Action Items

Leadership of quenches. Offline discussion.