PITMinutes 03-25-2019

From CASA Wiki
Jump to: navigation, search

Attendance

R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, L. King, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, A. Seryi, and S. Suhring.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Operations over the past two weeks have been relatively quite. The energy has been scaled back to 1000 GeV in NLINAC and 1020 GeV in SLINAC.


2. Cryomodule Shuffle Planning (Freyberg)

There have been several meetings where cryomodule shuffles for the summer have been planned out with the goal to get energy margin back, especially in the north linac. Attached are various presentations


Energy Reach Brainstorming Meeting

Energy Reach Options A,B,C

Additional Options D,E

Option D Energy-time Plot

Option E Energy-time Plot

3. Investigation of "Quench" Faults (Powers)

Many indicated quench faults are not real quenches because the field energy leaves the cavities too quickly. Some preliminary investigations


False Quenches and Other Topics

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?