PITMinutes 03-25-2019
Attendance
R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, L. King, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, A. Seryi, and S. Suhring.
Agenda and Notes
1. Operations Status and Summary/Review (Freyberger)
Operations over the past two weeks have been relatively quite. The energy has been scaled back to 1000 GeV in NLINAC and 1020 GeV in SLINAC.
2. Cryomodule Shuffle Planning (Freyberg)
There have been several meetings where cryomodule shuffles for the summer have been planned out with the goal to get energy margin back, especially in the north linac. Attached are various presentations
Energy Reach Brainstorming Meeting
3. Investigation of "Quench" Faults (Powers)
Many indicated quench faults are not real quenches because the field energy leaves the cavities too quickly. Some preliminary investigations
False Quenches and Other Topics
Action Items
Leadership of quenches. Offline discussion.
C100 Refurbishment Project for the future?