K. Baggett, J. Benesch, M. Bickley, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, C. Ginsburg, K. Jordan, A. Kimber, L. King, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, R. Nelson, W. Oren, A. Palczewski., T. Plawski, T. Powers, J. Preble, T. Reilly, A. Seryi, S. Suhring, M. Spata, and H. Wang

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

New Module a good performer. It's doing about 105 MeV. Cavity two had vacuum issues solved by setting to 19.5 MeV. Best cryomodule in the machine now. Cavity Eight had a low onset of FE, running at 12.5 MeV; running now without FE.


2. Waveform Faults Waveforms (Powers)

CEBAF Vacuum: "Cold" Vacuum System and Interlocks

Linac Vacuum Section: CEBAF Design Handbook

CEBAF Vacuum System and Interlocks for Original 4 GeV Accelerator

Beam Pipe and Waveguide Vacuum Interlocks (Author: K. Jordan)

WBS1 VACUUM CONTROL SYSTEM (Author: K. Jordan)

CEBAF C100 Style Vacuum Interlocks


3. Separator Improvement Plan (Wissman)

Plans and cost estimates

4. Vacuum Trip Thresholds for Various Sites (Geng)

Beamline Vacuum Trip Thresholds for Various Accelerators