PITMinutes 02-10-2020

From CASA Wiki
Jump to: navigation, search

Attendance

K. Baggett, J. Benesch, M. Bickley, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, C. Ginsburg, K. Jordan, A. Kimber, L. King, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, R. Nelson, W. Oren, A. Palczewski., T. Plawski, T. Powers, J. Preble, T. Reilly, A. Seryi, S. Suhring, M. Spata, and H. Wang

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

No Report.

2. Waveform Faults Waveforms (Powers)

Short Presentation and Backup Slides

On the basis of this presenttion agreed to adjust trip levels on 4 C100 modules and observe change in trip performance.

3. Separator Improvement Plan (Wissman)

Plans and cost estimates

4. Vacuum Trip Thresholds for Various Sites (Geng)

Beamline Vacuum Trip Thresholds for Various Accelerators