Attendance

K. Baggett, J. Benesch, M. Bickley, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, C. Ginsburg, K. Jordan, A. Kimber, L. King, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, R. Nelson, W. Oren, A. Palczewski., T. Plawski, T. Powers, J. Preble, T. Reilly, A. Seryi, S. Suhring, M. Spata, and H. Wang

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

New Module a good performer. It's doing about 105 MeV. Cavity two had vacuum issues solved by setting to 19.5 MeV. Best cryomodule in the machine now.

2. Waveform Faults Waveforms (Powers)

CEBAF Vacuum: "Cold" Vacuum System and Interlocks

Linac Vacuum Section: CEBAF Design Handbook

CEBAF Vacuum System and Interlocks for Original 4 GeV Accelerator

Beam Pipe and Waveguide Vacuum Interlocks (Author: K. Jordan)

WBS1 VACUUM CONTROL SYSTEM (Author: K. Jordan)

CEBAF C100 Style Vacuum Interlocks


3. Cavity Gradient Degradation (Benesch)

Cavity Gradient Degradation

RF Dashboard


4. Vacuum Trip Thresholds for Various Sites (Geng)

Beamline Vacuum Trip Thresholds for Various Accelerators