Beam OPS again.
 
Operations at 12 GeV. R100 tripping because of
 
Operations at 12 GeV. R100 tripping because of
construction noise
+
construction noise.
  
Beam ops again 28th January.
+
Jan 18-28 ran RF/cavities operate without beam.
 
+
Jan 18-28 can RF/cavities operate without beam.
+
 
Turn on/off infrastructure see microphonic effect.
 
Turn on/off infrastructure see microphonic effect.
  
Daly will compose "He boiling" TP
+
Powers to produce a heat transfer and choking at
 
+
lower temp test plan.
Powers heat transfer and choking at lower temp test plan.
+
  
 
Running at low temperature.
 
Running at low temperature.
Line 29: Line 27:
  
 
One hour machine ops devoted to
 
One hour machine ops devoted to
Fast X-ray detection of FE, able to tune for reduced losses
+
Fast X-ray detection of FE, able to tune for reduced losses.
in  . Establish baselines for future comparisons.
+
Establish baselines for future comparisons.
  
 
C100 tests (determine best pressure
 
C100 tests (determine best pressure
Line 40: Line 38:
 
operating at high values.
 
operating at high values.
  
destinguish/study SEL GDR trip differences (Rama)
+
distinguish/study SEL GDR trip differences (Rama)
  
Future mechanical investigations to elliminate vibrations
+
Future mechanical investigations to eliminate vibrations
 
in the first place may be appropriate going forward.
 
in the first place may be appropriate going forward.
  

Revision as of 10:16, 15 February 2016

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Powers, H. Wang

Agenda and Notes

1. Operations Status and Summary

Beam OPS again. Operations at 12 GeV. R100 tripping because of construction noise.

Jan 18-28 ran RF/cavities operate without beam. Turn on/off infrastructure see microphonic effect.

Powers to produce a heat transfer and choking at lower temp test plan.

Running at low temperature. Differences between expectations and Q curves.

Piezo work started on R100. Should be possible to get some microphonic damping. Stay tuned, code/software problems.

Regular beam studies on Tuesdays and thursdays for RF recovery.

One hour machine ops devoted to Fast X-ray detection of FE, able to tune for reduced losses. Establish baselines for future comparisons.

C100 tests (determine best pressure "defined by highest operating gradient" to operate at)

Got 70% of cavities back up to E_maxop values, but were having cooling/instability problems when operating at high values.

distinguish/study SEL GDR trip differences (Rama)

Future mechanical investigations to eliminate vibrations in the first place may be appropriate going forward.


2. C75 Project Preliminary Design Review

Review held on 01/21/2016


3. Particulate-Free UHV Meeting (Geng)

Agenda for February 29 Program

4. New OPS PIT Tactical Team (Legg, Hutton)

5. Superinsulation Damage? (???)

6. R&D for improving and maintaining CEBAF gradient (in situ?)

Action Items

Data mining for field emission (Geng)

Heat For Project Charter (freyberger)