Difference between revisions of "PITMinutes 02-01-2016"

From CASA Wiki
Jump to: navigation, search
Line 42: Line 42:
  
 
4. New OPS PIT Tactical Team (Legg, Hutton)
 
4. New OPS PIT Tactical Team (Legg, Hutton)
 +
 +
5. Superinsulation Damage? (???)
 +
 +
6. R&D for improving and maintaining CEBAF gradient (in situ?)
  
 
== Action Items ==
 
== Action Items ==

Revision as of 14:22, 1 February 2016

Attendance

R. Bachimanchi, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, A. Kimber, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, T. Powers, S. Suhring, H. Zhang

Agenda and Notes

1. Operations Status and Summary

Operations at 12 GeV.

Beam ops again 28th January.

Jan 18-28 can RF/cavities operate without beam. Turn on/off infrastructure see microphonic effect.

Daly will compose "He boiling" TP

C100 tests (determine best pressure "defined by highest operating gradient" to operate at)

destinguish/study SEL GDR trip differences (Rama)

2. C75 Project Preliminary Design Review

Review held on 01/21/2016


3. Particulate-Free UHV Meeting (Geng)

Agenda for February 29 Program

4. New OPS PIT Tactical Team (Legg, Hutton)

5. Superinsulation Damage? (???)

6. R&D for improving and maintaining CEBAF gradient (in situ?)

Action Items

Data mining for field emission (Geng)

Heat For Project Charter (freyberger)