Difference between revisions of "PITMinutes 02-01-2016"

From CASA Wiki
Jump to: navigation, search
(New page: == Attendance == R. Bachimanchi, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, A. Kimber, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, T. Powers, S. Su...)
 
Line 28: Line 28:
 
* [http://casa.jlab.org/LINACPIT/C75_Project_Review_Schedule.doc C75 Project Preliminary Design Review]
 
* [http://casa.jlab.org/LINACPIT/C75_Project_Review_Schedule.doc C75 Project Preliminary Design Review]
 
* [https://www.jlab.org/indico/conferenceDisplay.py?confId=137 Preliminary Design Review Indico Site]
 
* [https://www.jlab.org/indico/conferenceDisplay.py?confId=137 Preliminary Design Review Indico Site]
* [http://casa.jlab.org/LINACPIT/C75_Project_Review_Report.doc C75 Project Preliminary Design Review Report]
+
* [http://casa.jlab.org/LINACPIT/C75_PDR_Report_012716.doc C75 Project Preliminary Design Review Report]
  
  

Revision as of 10:23, 1 February 2016

Attendance

R. Bachimanchi, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, A. Hutton, A. Kimber, L. King, G. Krafft, F. Marhauser, C. Mounts, C. Reece, T. Reilly, T. Powers, S. Suhring, H. Zhang

Agenda and Notes

1. Operations Status and Summary

Operations at 12 GeV.

Beam ops again 28th January.

Jan 18-28 can RF/cavities operate without beam. Turn on/off infrastructure see microphonic effect.

Daly will compose "He boiling" TP

C100 tests (determine best pressure "defined by highest operating gradient" to operate at)

destinguish/study SEL GDR trip differences (Rama)

2. C75 Project Preliminary Design Review

Review held on 01/21/2016


3. Particulate-Free UHV Meeting (Geng)

Schedule for February 29 Program? Rong-liu will put together an agenda beginning of next year



Action Items

Data mining for field emission (Geng)

Heat For Project Charter (freyberger)