Difference between revisions of "JLEIC Impedance"
From CASA Wiki
(→Meeting Presentations) |
(→Meeting Presentations) |
||
Line 4: | Line 4: | ||
*Tim Michalski [https://jeffersonlab-my.sharepoint.com/:p:/r/personal/hkpark_jlab_org/_layouts/15/Doc.aspx?sourcedoc=%7BE2EB7059-848D-4F74-B724-3DDB41D3C053%7D&file=Impedance%20Meeting%20-%20Status%20and%20Outlook%20on%20Engineering%20Design%20-%2020190716%20TJM%20Rev%201.pptx&action=edit&mobileredirect=true Status and outlook on Engineering Design] | *Tim Michalski [https://jeffersonlab-my.sharepoint.com/:p:/r/personal/hkpark_jlab_org/_layouts/15/Doc.aspx?sourcedoc=%7BE2EB7059-848D-4F74-B724-3DDB41D3C053%7D&file=Impedance%20Meeting%20-%20Status%20and%20Outlook%20on%20Engineering%20Design%20-%2020190716%20TJM%20Rev%201.pptx&action=edit&mobileredirect=true Status and outlook on Engineering Design] | ||
− | |||
=== 2019-06-17 === | === 2019-06-17 === |
Revision as of 15:09, 2 August 2019
Contents
Meeting Presentations
2019-07-16
- Tim Michalski Status and outlook on Engineering Design
2019-06-17
2019-05-14
- Frank Marhauser Status of IR chamber impedance analyses
- Gunn Tae Park Beam loading study of harmonic kicker
2019-04-22
2019-03-25
- HyeKyoung Park The wakefield study results of crab cavity
- Rui Li Summary of broadband and narrowband impedance studies for JLEIC
2019-2-22
- Shaoheng Wang Narrow Band Impedance Threshold for Longitudinal Coupled Bunch Instability
- Frank Marhauser JLEIC Impedance Status
2018-12-10
- Frank Marhauser Impedance Status
- Vasiliy Morozov Status of IR Design and Collimators
- Rui Li Discussion of JLEIC Impedance Priorities
2018-08-02
- Kirsten Deitrick Ion Ring Broadband Impedance (Collision)
- Rui Li Coupled Bunch Instability (CBI) in JLEIC
- Frank Marhauser Progress on the Design of the JLEIC Ion Ring Cavities (JLAB-TN-18-041)
2018-06-25
- Shaoheng Wang Cavity Longitudinal Impedance Thresholds Determination for Coupled Bunch Instability
- Kirsten Deitrick Kickers and Update on Broadband Impedance
- Rui Li Longitudinal Coupled Bunch Instability for the Ion Ring
- HyeKyoung Park Update on Crab Cavity HOMs
2018-05-14
- Shaoheng Wang Impedance Calculation for Interaction Region in Colliders
- Rui Li Impedance Study at IPAC18
2018-03-19
- Kirsten Deitrick Broadband Longitudinal Impedance Estimates
2018-03-02 (IR Chamber)
- Frank Marhauser Impedances in the EIC IR Chamber
2018-02-19
- HyeKyoung Park Crab Cavity Updates
- Salvador Sosa Power from Longitudinal Crab Cavity HOMs
- Mark Wiseman IR Bellows Requirement
- Rui Li Impedance Thresholds from the Instability Estimations
2017-12-04
- Rui Li Discussion on Concepts of Wakefield and Impedance
- Suba De Silva HOM and Impedance Analysis for Crabbing Cavity System
Relevant R&D Presentations
- Rui Li Ion Effects in the JLEIC Electron Collider Ring (2018-03-15)
- Rui Li Detailed Studies of Longitudinal Coupled Bunch Instabilities in JLEIC (2017-07-20)
- Rui Li Instabilities and Collective Effects (2017-06-08)
- Rui Li Status of Instability Estimation for JLEIC (2017-03-23)
- Rui Li JLEIC Collective Effects (2017-02-23)
- Rui Li Discussion of Impedance Budget (2017-02-09)
- Older presentations exist, see MEIC R&D Meeting webpage
Other Links
- Impedance Budgets and Estimates Spreadsheet
- Part counts, impedance values from other machines, JLab simulation results, estimates, references
- Everyone can add simulation results - email Kirsten (kdeit001@odu.edu) if you have questions