Difference between revisions of "PITMinutes 12-08-2014"

From CASA Wiki
Jump to: navigation, search
Line 6: Line 6:
  
 
# Operations Status and Summary
 
# Operations Status and Summary
** Bellows observed to be rusted in 2L25. Suggested tha all bellows in similarly constructed CMs be inspected. Also, any useful post mortem on the rusted bellow? E. Daly will pursue.
+
## Bellows observed to be rusted in 2L25. Suggested tha all bellows in similarly constructed CMs be inspected. Also, any useful post mortem on the rusted bellow? E. Daly will pursue.
 
+
 
+
 
# LR PIT Wiki
 
# LR PIT Wiki
  
Access through CASA Wikis or https://casa.jlab.org/wiki/index.php/Long_Range_LINAC_Performance_Integration
+
## Access through CASA Wikis or https://casa.jlab.org/wiki/index.php/Long_Range_LINAC_Performance_Integration
  
Choose Long Range LINAC Performance Integration link
+
## Choose Long Range LINAC Performance Integration link
  
 
# Updated Distribution List
 
# Updated Distribution List

Revision as of 09:59, 10 December 2014

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, A. Freyberger, G. Krafft, F. Marhauser, R. Norton, C. Mounts, T. Plawski, J. Preble, R. Rimmer, S. Suhring

Agenda and Notes

  1. Operations Status and Summary
    1. Bellows observed to be rusted in 2L25. Suggested tha all bellows in similarly constructed CMs be inspected. Also, any useful post mortem on the rusted bellow? E. Daly will pursue.
  2. LR PIT Wiki
    1. Access through CASA Wikis or https://casa.jlab.org/wiki/index.php/Long_Range_LINAC_Performance_Integration
    1. Choose Long Range LINAC Performance Integration link
  1. Updated Distribution List


Documents and Presentations

Action Items

Link To long range schedule (Krafft)

Links to achieved and needed gradient reports (Freyberger)

Belows Investigation (Daly)