Difference between revisions of "PITMinutes 12-08-2014"

From CASA Wiki
Jump to: navigation, search
Line 28: Line 28:
  
 
Link To long range schedule (Krafft)
 
Link To long range schedule (Krafft)
 +
 
Links to reports (Freyberger)
 
Links to reports (Freyberger)
 +
 +
Belows Investigation (Daly)

Revision as of 17:46, 8 December 2014

Attendance

R. Bachimanchi, S. Cooper, E. Daly, M. Drury, C. Hovater, A. Freyberger, G. Krafft, F. Marhauser, R. Norton, C. Mounts, T. Plawski, J. Preble, R. Rimmer, S. Suhring

Agenda and Notes

  1. Operations Status and Summary

Bellows observed to be rusted in 2L25. Suggested that all bellows in similarly constructed CMs be inspected. Also, any useful post mortem on the rusted below? E. Daly will pursue.


  1. LR PIT Wiki

Access through CASA Wikis

Choose Long Range LINAC Performance Integration link

  1. Updated Distribution List


Documents and Presentations

Action Items

Link To long range schedule (Krafft)

Links to reports (Freyberger)

Belows Investigation (Daly)