Difference between revisions of "PITMinutes 04-25-2016"

From CASA Wiki
Jump to: navigation, search
Line 11: Line 11:
  
 
Shutdown for open house started
 
Shutdown for open house started
Radiation not as bad as has been near C100s.
+
Radiation not as bad as has been near C100s
 +
Running lower gradient on suspected high FEs.
  
 
1050/linac insteaqd of 1090  11.6 GeV
 
1050/linac insteaqd of 1090  11.6 GeV

Revision as of 13:34, 25 April 2016

Attendance

R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, C. Reece, T. Plawski, H. Zhang

Agenda and Notes

1. Operations Status and Summary

OPS Staytreat Focus on reliability

Shutdown for open house started Radiation not as bad as has been near C100s Running lower gradient on suspected high FEs.

1050/linac insteaqd of 1090 11.6 GeV


2. Gradient Maintenance Team (Mounts)

Scope Creep?

3. FE/Particulate Meeting Report (Geng)

Follow on activity and future planning


4. C100 Gradient Recovery Planning

He processing the rest?

Capture degradation rate?

Other ideas?

Action Items