(Created page with "== Attendance == M. Bickley, E. Daly, C. Hovater, R. Geng, C. Ginsburg, A. Kimber, G. Krafft, C. Mounts, R. Nelson, T. Powers, C. Reece, and M. Wissmann == Agenda and Notes...")
 
(Attendance)
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
  
M. Bickley, E. Daly, C. Hovater, R. Geng, C. Ginsburg, A. Kimber, G. Krafft, C. Mounts, R. Nelson, T. Powers, C. Reece, and M. Wissmann
+
K. Baggett, M. Bickley, M. Drury, C. Hovater, R. Geng, C. Ginsburg, A. Hutton, A. Kimber, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Solopova
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 8: Line 8:
 
1. Operations Status and Summary/Review (Bickley)
 
1. Operations Status and Summary/Review (Bickley)
  
A week delay from vacuum problem.
+
RF is up. LEMed to 1031 MeV. Trip Rate viable. Enhanced trip rate
Physics start on Dec. 2. RF push on Thursday
+
indicated on 1L25, but at high gradient. Preparing for early high current test.
  
2. RF Separator Upgrades (Wissmann)
+
2. Vacuum Interlock Upgrades (Powers)
  
[https://casa.jlab.org/LINACPIT/Sep_Status_Projections.pptx RF Separator Improvements]
+
[https://casa.jlab.org/LINACPIT/PIT_meeting_Draft_Vacuum_Interlock_Modifications_2Dec19.pptx Vacuum Interlocks Modifications Proposed]
  
 
3. Particle Counter Update (Geng)
 
3. Particle Counter Update (Geng)
  
 
[https://casa.jlab.org/LINACPIT/Report_20191114145643.docx Particulates in Viton]
 
[https://casa.jlab.org/LINACPIT/Report_20191114145643.docx Particulates in Viton]
 
4. Descope energy to reduce FE? Discussion of any actions for OPS
 

Latest revision as of 15:47, 2 December 2019

Attendance

K. Baggett, M. Bickley, M. Drury, C. Hovater, R. Geng, C. Ginsburg, A. Hutton, A. Kimber, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Solopova

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

RF is up. LEMed to 1031 MeV. Trip Rate viable. Enhanced trip rate indicated on 1L25, but at high gradient. Preparing for early high current test.

2. Vacuum Interlock Upgrades (Powers)

Vacuum Interlocks Modifications Proposed

3. Particle Counter Update (Geng)

Particulates in Viton