Difference between revisions of "PITMinutes 03-25-2019"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
 
(2 intermediate revisions by the same user not shown)
Line 24: Line 24:
 
[https://casa.jlab.org/LINACPIT/CEBAF_EnergyReach_BrainStormingFY19onward_post1L25.pdf Energy Reach Options A,B,C]
 
[https://casa.jlab.org/LINACPIT/CEBAF_EnergyReach_BrainStormingFY19onward_post1L25.pdf Energy Reach Options A,B,C]
  
[https://casa.jlab.org/LINACPIT/CEBAF_EnergyReach_BrainStormiing_Meeting3.pdf Additional Options D,E]
+
[https://casa.jlab.org/LINACPIT/CEBAF_EnergyReach_BrainStorming_Meeting3.pdf Additional Options D,E]
[https://casa.jlab.org/LINACPIT/RF_Pit_25Mar2019.pdf False Quenches and Other Topics]
+
 
[https://casa.jlab.org/LINACPIT/RF_Pit_25Mar2019.pdf False Quenches and Other Topics]
+
[https://casa.jlab.org/LINACPIT/eReach_OptionD_Mar2019_LT_scale085.png Option D Energy-time Plot]
 +
 
 +
[https://casa.jlab.org/LINACPIT/eReach_OptionD_Mar2019_LT_scale085.png Option E Energy-time Plot]
  
 
3. Investigation of "Quench" Faults (Powers)
 
3. Investigation of "Quench" Faults (Powers)
  
 
Many indicated quench faults are not real quenches because
 
Many indicated quench faults are not real quenches because
the field energy leaves the cavities to quickly. Some
+
the field energy leaves the cavities too quickly. Some
 
preliminary investigations
 
preliminary investigations
  

Latest revision as of 09:09, 27 March 2019

Attendance

R. Bachimanchi, K. Baggett, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, L. King, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, A. Seryi, and S. Suhring.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Operations over the past two weeks have been relatively quite. The energy has been scaled back to 1000 GeV in NLINAC and 1020 GeV in SLINAC.


2. Cryomodule Shuffle Planning (Freyberg)

There have been several meetings where cryomodule shuffles for the summer have been planned out with the goal to get energy margin back, especially in the north linac. Attached are various presentations


Energy Reach Brainstorming Meeting

Energy Reach Options A,B,C

Additional Options D,E

Option D Energy-time Plot

Option E Energy-time Plot

3. Investigation of "Quench" Faults (Powers)

Many indicated quench faults are not real quenches because the field energy leaves the cavities too quickly. Some preliminary investigations


False Quenches and Other Topics

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?