Difference between revisions of "PITMinutes 12-02-2019"
From CASA Wiki
(→Attendance) |
(→Agenda and Notes) |
||
Line 8: | Line 8: | ||
1. Operations Status and Summary/Review (Bickley) | 1. Operations Status and Summary/Review (Bickley) | ||
− | + | RF is up. LEMed to 1031 MeV. Trip Rate viable. Enhanced trip rate | |
+ | indicated on 1L25, but at high gradient. Preparing for early high current test. | ||
2. Vacuum Interlock Upgrades (Powers) | 2. Vacuum Interlock Upgrades (Powers) |
Revision as of 14:35, 2 December 2019
Attendance
K. Baggett, M. Bickley, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, A. Kimber, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, and M. Wissmann
Agenda and Notes
1. Operations Status and Summary/Review (Bickley)
RF is up. LEMed to 1031 MeV. Trip Rate viable. Enhanced trip rate indicated on 1L25, but at high gradient. Preparing for early high current test.
2. Vacuum Interlock Upgrades (Powers)
Vacuum Interlocks Modifications Proposed
3. Particle Counter Update (Geng)