Difference between revisions of "JLEIC Impedance"
From CASA Wiki
(→2018-12-10) |
(→2019-02-08) |
||
Line 1: | Line 1: | ||
== Meeting Presentations == | == Meeting Presentations == | ||
− | === 2019- | + | === 2019-03-25 === |
+ | |||
=== 2018-2-22 === | === 2018-2-22 === | ||
*Shaoheng Wang [https://jeffersonlab-my.sharepoint.com/personal/lir_jlab_org/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Flir%5Fjlab%5Forg%2FDocuments%2FAttachments%2F2019%5F02%5F22%5FLCBI%20Impedance%20Threshold%20in%20Ion%20Ring%2Epdf&parent=%2Fpersonal%2Flir%5Fjlab%5Forg%2FDocuments%2FAttachments Narrow Band Impedance Threshold for Longitudinal Coupled Bunch Instability] | *Shaoheng Wang [https://jeffersonlab-my.sharepoint.com/personal/lir_jlab_org/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Flir%5Fjlab%5Forg%2FDocuments%2FAttachments%2F2019%5F02%5F22%5FLCBI%20Impedance%20Threshold%20in%20Ion%20Ring%2Epdf&parent=%2Fpersonal%2Flir%5Fjlab%5Forg%2FDocuments%2FAttachments Narrow Band Impedance Threshold for Longitudinal Coupled Bunch Instability] |
Revision as of 16:25, 14 March 2019
Contents
Meeting Presentations
2019-03-25
2018-2-22
- Shaoheng Wang Narrow Band Impedance Threshold for Longitudinal Coupled Bunch Instability
- Frank Marhauser JLEIC Impedance Status
2018-12-10
- Frank Marhauser Impedance Status
- Vasiliy Morozov Status of IR Design and Collimators
- Rui Li Discussion of JLEIC Impedance Priorities
2018-08-02
- Kirsten Deitrick Ion Ring Broadband Impedance (Collision)
- Rui Li Coupled Bunch Instability (CBI) in JLEIC
- Frank Marhauser Progress on the Design of the JLEIC Ion Ring Cavities (JLAB-TN-18-041)
2018-06-25
- Shaoheng Wang Cavity Longitudinal Impedance Thresholds Determination for Coupled Bunch Instability
- Kirsten Deitrick Kickers and Update on Broadband Impedance
- Rui Li Longitudinal Coupled Bunch Instability for the Ion Ring
- HyeKyoung Park Update on Crab Cavity HOMs
2018-05-14
- Shaoheng Wang Impedance Calculation for Interaction Region in Colliders
- Rui Li Impedance Study at IPAC18
2018-03-19
- Kirsten Deitrick Broadband Longitudinal Impedance Estimates
2018-03-02 (IR Chamber)
- Frank Marhauser Impedances in the EIC IR Chamber
2018-02-19
- HyeKyoung Park Crab Cavity Updates
- Salvador Sosa Power from Longitudinal Crab Cavity HOMs
- Mark Wiseman IR Bellows Requirement
- Rui Li Impedance Thresholds from the Instability Estimations
2017-12-04
- Rui Li Discussion on Concepts of Wakefield and Impedance
- Suba De Silva HOM and Impedance Analysis for Crabbing Cavity System
Relevant R&D Presentations
- Rui Li Ion Effects in the JLEIC Electron Collider Ring (2018-03-15)
- Rui Li Detailed Studies of Longitudinal Coupled Bunch Instabilities in JLEIC (2017-07-20)
- Rui Li Instabilities and Collective Effects (2017-06-08)
- Rui Li Status of Instability Estimation for JLEIC (2017-03-23)
- Rui Li JLEIC Collective Effects (2017-02-23)
- Rui Li Discussion of Impedance Budget (2017-02-09)
- Older presentations exist, see MEIC R&D Meeting webpage
Other Links
- Impedance Budgets and Estimates Spreadsheet
- Part counts, impedance values from other machines, JLab simulation results, estimates, references
- Everyone can add simulation results - email Kirsten (kdeit001@odu.edu) if you have questions