== Attendance ==
 
== Attendance ==
  
R. Bachimanchi, K. Baggett, E. Daly, A. Freyberger, C. Hovater, A. Hutton, G. Krafft, A. Kimber, R. Legg, M. McCaughan. F. Marhauser, R. Nelson, T. Powers, T. Plawski, T. Reilly, R. Rimmer, and S. Suhring
+
R. Bachimanchi, K. Baggett, A. Freyberger, R. Geng, C. Hovater, G. Krafft, A. Kimber, C. Mounts, T. Powers, T. Plawski, T. Reilly, R. Rimmer, S. Suhring, and H. Wang.
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
Recovery Plans. Still Diagnosing Cryo problems.
 
Definite sensor wire connection failure. Only 4 K
 
work over the summer. Probably no 2 K ops until late summer.
 
Still need to open up and look to make sure no damage.
 
Cryo Review first week June to help on turnon operations
 
again.
 
  
 
Twenty years plan for meeting performance and maintaining
 
Twenty years plan for meeting performance and maintaining
Line 21: Line 15:
 
(calling infrastructure might make funding easier)
 
(calling infrastructure might make funding easier)
  
[https://casa.jlab.org/LINACPIT/CEBAF_Performance_Plan_with_SRF_RF_Cryo_emphasis-1.pdf CEBAF Performance Plan]
+
[https://casa.jlab.org/LINACPIT/RF-PIT_CEBAF_Performance_Plan_with_SRF_RF_Cryo_emphasis.pdf CEBAF Performance Plan]
  
 +
Extensive discussion about potential radiation monitorring and
 +
how might get information about "dose to C100 failure".
  
 +
2. "Staytreat"
  
2. "Staytreat" Discussion
+
Now August 2-3.
Preliminary topics list have been uploaded.
+
Meeting has been drifting back towards end of
+
summer. Now August 2-3.
+
  
  
 
3. Performance of C57
 
3. Performance of C57
  
Gradients of two reworked "C57" cavities are topping
+
Gigi's talk delayed due to new addition to his family.
out in mid-teens of cavity gradient. Full upgrades of
+
Presentation in two weeks.
LLRF and klystrons not needed (still probably like hot
+
klystrons on these cavities.) Presentation next week.
+
  
  
4. Backing Pump Discussion
+
4. Particulates reporting; SRF in Dirty Machine Workshop: HZB.
  
Additional data mining performed. Consult with
 
Benesch and . Gigi marcy looked at geome34try and
 
suggested ,.  Capacitor pumps on order anyway. Go
 
through and sellect a promising module for test.
 
4 weeks plan will be presented.
 
Next Steps
 
 
[https://casa.jlab.org/LINACPIT/CEBAF_Performance_Plan_with_SRF_RF_Cryo_emphasis-1.pdf CEBAF Performance Plan]
 
 
 
5. Lead Collars (Legg)
 
 
[https://casa.jlab.org/LINACPIT/Lead_Collars_For_C100s.pdf Lead Collars for C100s]
 
 
 
Radiation shielding at end of C100s has been explored by Legg.
 
preliminary design has been completed. goal to help save girders.
 
 
New module will be C57. More planning for the 2018 Module needed.
 
 
4. Particulates reporting; SRF in Dirty Machine Workshop: HZB.
 
 
Josh, Tom, and Thomas in two weeks.
 
Josh, Tom, and Thomas in two weeks.
  

Latest revision as of 13:14, 23 May 2017

Attendance

R. Bachimanchi, K. Baggett, A. Freyberger, R. Geng, C. Hovater, G. Krafft, A. Kimber, C. Mounts, T. Powers, T. Plawski, T. Reilly, R. Rimmer, S. Suhring, and H. Wang.

Agenda and Notes

1. Operations Status and Summary


Twenty years plan for meeting performance and maintaining 12 GeV performance. Gradient Achievement and maintenance plans being developed. Need 8 New C75 modules over 5 years. 37 weeks/yr goal. Obselescence plan will also be included (old analogue to digital) Presentation is two weeks. Potential new cold box in plan (calling infrastructure might make funding easier)

CEBAF Performance Plan

Extensive discussion about potential radiation monitorring and how might get information about "dose to C100 failure".

2. "Staytreat"

Now August 2-3.


3. Performance of C57

Gigi's talk delayed due to new addition to his family. Presentation in two weeks.


4. Particulates reporting; SRF in Dirty Machine Workshop: HZB.

Josh, Tom, and Thomas in two weeks.

Girder Particulate Summary

Action Items

Leadership of quenches. Offline discussion.