Difference between revisions of "PITMinutes 12-08-2014"

From CASA Wiki
Jump to: navigation, search
 
(23 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Attendance ==
 
== Attendance ==
 +
 +
R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, A. Freyberger, G. Krafft, F. Marhauser, R. Norton, C. Mounts, T. Plawski, J. Preble, R. Rimmer, S. Suhring
  
 
== Agenda and Notes ==
 
== Agenda and Notes ==
  
# Operations Summary
+
# Operations Status and Summary
# item 2
+
## Helium Processing Planning needs to occur. There will be an initial planning meeting Thursday Dec. 11
*** bullet example
+
## Bellows observed to be rusted in 2L25. Suggested that all bellows in similarly constructed CMs be inspected. Also, any useful post mortem on the rusted bellow? E. Daly will pursue.
**** two bullet example
+
# LR PIT Wiki
# [[anotherWikiPage example | another WikiPage example ]]
+
## Access through CASA Wikis
# [http://casa.jlab.org CASA Website]
+
## Choose Long Range LINAC Performance Integration link
 +
## or https://casa.jlab.org/wiki/index.php/Long_Range_LINAC_Performance_Integration
 +
# Updated Distribution List
 +
 
  
 
== Documents and Presentations ==
 
== Documents and Presentations ==
  
* [http://casa.jlab.org/LINACPIT/C100_Commissioning_FE_data.xlsx C100 Commissioning Data]
 
  
 
== Action Items ==
 
== Action Items ==
 +
 +
Link To long range schedule (Krafft)
 +
 +
Links to achieved and needed gradient reports (Freyberger)
 +
 +
Belows Investigation (Daly)

Latest revision as of 10:04, 10 December 2014

Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, A. Freyberger, G. Krafft, F. Marhauser, R. Norton, C. Mounts, T. Plawski, J. Preble, R. Rimmer, S. Suhring

Agenda and Notes

  1. Operations Status and Summary
    1. Helium Processing Planning needs to occur. There will be an initial planning meeting Thursday Dec. 11
    2. Bellows observed to be rusted in 2L25. Suggested that all bellows in similarly constructed CMs be inspected. Also, any useful post mortem on the rusted bellow? E. Daly will pursue.
  2. LR PIT Wiki
    1. Access through CASA Wikis
    2. Choose Long Range LINAC Performance Integration link
    3. or https://casa.jlab.org/wiki/index.php/Long_Range_LINAC_Performance_Integration
  3. Updated Distribution List


Documents and Presentations

Action Items

Link To long range schedule (Krafft)

Links to achieved and needed gradient reports (Freyberger)

Belows Investigation (Daly)