Attendance

S. Cooper, A. Freyberger, R. Geng, G. Krafft, F. Marhauser, T. Powers, J. Preble, T. Reilly, C. Reece, H. Wang

Agenda and Notes

1. Operations Status and Summary


After recovery, 1 Module exposed to air look pretty much the same from gradient pov.

Other exposed modules being cooled down.

Cryo on schedule for transition on Sept. 21 to two plant OPS.

4 C100s in north and 1 in injector will not be processed. problems uncovered need to be understood. Presentations made to SRF science and analysis meeting.


2. C75 Project Summary Document (Krafft, Freyberger)

3. SRF Budgeting for C50, C75, and R&D (McEwen, Geng)

4. C75 Power Curves (Krafft)

Action Items