PITMinutes 08-31-2015

From CASA Wiki
Revision as of 13:37, 31 August 2015 by Krafft (Talk | contribs)

Jump to: navigation, search

Attendance

R. Bachimanchi, S. Cooper, R. Geng, C. Hovater, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, T. Plawski, T. Powers, C. Reece, H. Wang, H. Zhang

Agenda and Notes

1. Operations Status and Summary


After recovery, 1 Module exposed to air look pretty much the same from gradient pov.

Other exposed modules being cooled down.

Cryo on schedule for transition on Sept. 21 to two plant OPS.


2. C75 Project Summary Document (Krafft, Freyberger)

3. SRF Budgeting for C50, C75, and R&D (McEwen, Geng)

4. C75 Power Curves (Krafft)

Action Items