PITMinutes 08-17-2015

From CASA Wiki
Revision as of 13:29, 17 August 2015 by Krafft (Talk | contribs)

Jump to: navigation, search

Attendance

R. Bachimanchi, J. Benesch, S. Cooper, A. Freyberger, R. Geng, C. Hovater, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, T. Plawski, R. Rimmer, T. Powers, H. Wang, H. Zhang

Agenda and Notes

1. Operations Status and Summary

Cryo systems are being repaired and checked out. Additional vain bending in CHL 2 observed. Repairs started in parallel in CHL 1 repairs. Tentatively same restart in fall.

Drury thinks one module behind, Arne perhaps thinks it's more like 3. With 3 crews, maybe a week or two delay to ops. Also, looking for cavities to not He process.

New results from Cornell in Archive on surface treatments in archive. Need to digest.

2. Module RF Soak Planning (R. Bachimanchi)

3. Gradient degradation: root causes and in-situ recovery techniques (Geng)

Action Items