PITMinutes 01-10-2020

From CASA Wiki
Revision as of 08:42, 10 January 2020 by Krafft (Talk | contribs) (Agenda and Notes)

Jump to: navigation, search

Attendance

K. Baggett, M. Bickley, M. Drury, C. Hovater, R. Geng, C. Ginsburg, A. Hutton, A. Kimber, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Solopova

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Restart is proceding/

2. Warm Region Vacuum Specifications (Preble)

CEBAF Vacuum: "Cold" Vacuum System and Interlocks Interlocks

Linac Vacuum Section: CEBAF Design Handbook

CEBAF Vacuum System and Interlocks for Original 4 GeV Accelerator

Beam Pipe and Waveguide Vacuum Interlocks (Author: K. Jordan)

WBS1 VACUUM CONTROL SYSTEM (Author: K. Jordan)

CEBAF C100 Style Vacuum Interlocks


3. Trip Rates Update (Geng)

Trip Rates Update