PITMinutes 10-07-2019

From CASA Wiki
Revision as of 12:49, 7 October 2019 by Krafft (Talk | contribs) (Agenda and Notes)

Jump to: navigation, search

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, R. Rimmer, A. Solopova, and .

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

Comments:


1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

Posted Fall Running (Grames)

Hall C Run Requirements (Benesch)

Comments: A High current (150 muA) 1 pass running. Not too much stress!


1:25 Performance Expectations in Relocated Modules (Drury)

Expected Performance After CM Swaps (Drury)

1:50 RF Configuration after SAD (Hovater)

Comments:


1:55 Gradient Choice at Turnon (Benesch)

Fall Polarization Options (Benesch)

Fall Turnon Gradient Choice (Benesch)

2:05 Present Gradient Limitations (Drury)

Data from Commissioning (Drury)

2:25 Gradient Change Instructions for OPS (Solopova)

Gradient Change Instruction for OPS (Solopova)

Comments:


2:40 Energy Reach (Baggett)

Comments:


2:50 CEBAF Performance Plan (Michaud)

Gradient Change Instruction for OPS (Michaud)

Comments: