PITMinutes 10-07-2019

From CASA Wiki
Revision as of 10:57, 7 October 2019 by Krafft (Talk | contribs) (Attendance)

Jump to: navigation, search

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Seryi.

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

Posted Fall Running (Grames)

Hall C Run Requirements (Benesch)

1:25 Performance Expectations in Relocated Modules (Drury)

Expected Performance After CM Swaps (Drury)

1:50 RF Configuration after SAD (Hovater)

1:55 Gradient Choice at Turnon (Benesch)

Fall Polarization Options (Benesch)

Fall Turnon Gradient Choice (Benesch)

2:05 Present Gradient Limitations (Drury)

2:25 Gradient Change Instructions for OPS (Solopova)

Gradient Change Instruction for OPS (Benesch)

2:40 Energy Reach (Baggett)

2:50 CEBAF Performance Plan (Michaud)