PITMinutes 05-06-2019
From CASA Wiki
Revision as of 13:24, 6 May 2019 by Krafft (Talk | contribs) (Created page with "== Attendance == R. Bachimanchi, K. Baggett, M. Bickley, K. Davis, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Nelson, T. Plawski, T. Powers, and H. Wang. == Agenda and No...")
Attendance
R. Bachimanchi, K. Baggett, M. Bickley, K. Davis, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Nelson, T. Plawski, T. Powers, and H. Wang.
Agenda and Notes
1. Operations Status and Summary/Review (Freyberger)
Continued quiet running at reduced energy. 85% availability at low energy.
2. RF Fault analysis (Plawski)
Many indicated quench faults are not real quenches because the field energy leaves the cavities too quickly. Some preliminary investigations
False Quenches and Other Topics
3. Cryomnodule Modifications (Marhauser)
Spread sheet for performance prediction has been created. Many different scenarios may now be investigated.
Energy Reach Calculator/Predictor
Action Items
Leadership of quenches. Offline discussion.
C100 Refurbishment Project for the future?