PITMinutes 09-04-2018

From CASA Wiki
Revision as of 09:10, 4 September 2018 by Krafft (Talk | contribs) (New page: == Attendance == R. Bachimanchi, J. Benesch, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimme...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Attendance

R. Bachimanchi, J. Benesch, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, A. Seryi, and A. Solopova.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Multipass beam reestablished in preparation for the physics run. In the middle of last week beam to Hall C and CW checks were initiated. Beam energy of 1050/linac was achieved with fairly reasonable trip rates as the RF recoved (see 2.)

Toward the end of last week vacuum issues, especially in the north linac SRF, necessitated halting of beam delivery to physics. Investigations of leaks continuing.

RF Heat and Q0 balancing are probably not in balance. Any Update?

2. CEBAF Turnon Status (Solopova)

C100 Status at Before Vacuum Troubles

3. C100 Refurbishment Planning (Krafft, Reilly)

C100 System Improvement Discussion

Items Request Email

C100 Refurbishment Brainstorming List

Tony's C100 Refurbishment Brainstorming ppt

3. C100 Refurbishment Planning (Krafft, Reilly)

C100 System Improvement Discussion

Items Request Email

C100 Refurbishment Brainstorming List

Tony's C100 Refurbishment Brainstorming ppt

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?