PITMinutes 04-09-2018
Attendance
R. Bachimanchi, K. Baggett, J. Benesch, R. Geng, C. Hovater, G. Krafft, A. Kimber, R. Legg, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Solopova.
Agenda and Notes
1. Operations Status and Summary/Review (Freyberger)
High average current limits remain. Usually A runs 22.5 muA and C runs 50-60 muA. Seems more an more solid that the Hall C current limit is 70-75 muA, independent of the Hall A current. And the main trips are from beam loss. So focus is shifting back to injector. Today, bunch length measurements are being made for the different Hall bunches.
C75 Review completed. Here is the review report.
2. Radiation Reduction with Lead Collars (Legg)
3. More on Beam Loading and Q_ext (Krafft)
4. C100 Refurbishment Planning (Freyberger)
5. Draft Cryomodule Specification (Benesch)
Jay has written up a set of goals for the cryomodules: Draft Cryomodule Specification
6. Draft Acceptance Criteria (Legg)
Bob shared the LCLS II module acceptance criteria that the LCLS II project is working under. We should perhaps adopt something similar for C75? (Discuss Pros and Cons)
LCLS II Module Acceptance Criteria
Frank and Gigi (mainly) have written up a C75 performance specification document.
JLAB-TN-17-055: Draft C75 Specification Document
Action Items
Leadership of quenches. Offline discussion.
Complete C75 Module Specifications (Marhauser, Benesch, Krafft)
C100 Refurbishment Project for the future?