Model Team Feb 02 2015
From CASA Wiki
Revision as of 11:26, 3 February 2015 by Roblin (Talk | contribs) (New page: == Presents == Alicia Hofler, Theo Larrieu, Rui Li, Yves Roblin, Todd Satogata, Dennis Turner, He Zhang ==Agenda == # Preparation for Feb 13th restart ## Current decks status/CED status ...)
Presents
Alicia Hofler, Theo Larrieu, Rui Li, Yves Roblin, Todd Satogata, Dennis Turner, He Zhang
Agenda
- Preparation for Feb 13th restart
- Current decks status/CED status
- Hall B model for upcoming run
- tief adding a skew quad to beamline
- Inclusion of 5th pass separation
- ready (Yves)
- Allsave/CED crosscheck tool
- Theo Larrieu
- Tesplans review
- What is left to do and prioritize it
- Review testplans and close/update as needed
- What is left to do and prioritize it
- Mid to long term model development
- Prepare for summer run (two halls at five pass with one recirculation)
- Yves, Jay working on it.
- Integrate injector model with CEBAF model
- Will resurrect discussions with Alicia and injector group (Yves)
- Dogleg focussing studies. Does it have to be included in model ?
- Develop procedure to crosscheck measured body gradient with machine.
- Feature requests for operational tools (EDT,elegant,etc..)
- EDT to have support for loading alternate optics via SDDS
- qSUtility to support zigzag scans
- Inclusion of multipole in model. Where is it needed ?
- Recent measurements/TOSCA show that Lambertson has a big quad and skew quad component
- Study of effect of orbits in spreader/recombiner on
- First and second order dispersion terms
- Linac accelerating profiles loaded into model
- Evaluate effect on focussing and need to rematch at spreader
- Prepare for summer run (two halls at five pass with one recirculation)
---