PITMinutes 03-28-2016

From CASA Wiki
Revision as of 14:41, 28 March 2016 by Krafft (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Attendance

R. Bachimanchi, S. Cooper, E. Daly, M. Drury, A. Freyberger, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, R. Rimmer, T. Plawski, T. Powers, S. Suhring

Agenda and Notes

1. Operations Status and Summary

LERF Borrowing

C50-12 is nominal solution yielding 11.7 GeV

No current plans for repurpose LERF modules

OPS Staytreat


2. Heat Measurement Results (Daly)

3. C75 (Marhauser/Rimmer)

4. FE/Particulate Meeting Report (Geng)



Action Items