Attendance

R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang

Agenda and Notes

Particulate Meeting two weeks

1. Operations Status and Summary

LERF Borrowing


Piezo work started on R100. Should be possible to get some microphonic damping. Stay tuned, code/software problems.


2. Heat Measurement Results (Daly)

Cabling damage is starting to be observed.

Monitor heat load changes, especially in C100s, to see if changes in material show up here. TLDs in the tunnel (end cans and warm girders)


3. C75 (Marhauser/Rimmer)

4. FE Meeting ReportR&D for improving and maintaining CEBAF gradient (Geng)



Action Items