PITMinutes 01-10-2020

From CASA Wiki
Revision as of 09:44, 8 January 2020 by Krafft (Talk | contribs) (Agenda and Notes)

Jump to: navigation, search

Attendance

K. Baggett, M. Bickley, M. Drury, C. Hovater, R. Geng, C. Ginsburg, A. Hutton, A. Kimber, G. Krafft, F. Marhauser, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, and A. Solopova

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Restart is proceding/

2. Warm Region Vacuum Specifications (Preble)

CEBAF Vacuum: "Cold" Vacuum System and Interlocks Interlocks

Linac Vacuum Section: CEBAF Design Handbook

CEBAF Vacuum System and Interlocks for Original 4 GeV Accelerator

Beam Pipe and Waveguide Vacuum Interlocks (Author: K. Jordan

WBS1 VACUUM CONTROL SYSTEM (Author: K. Jordan)


Vacuum Interlocks Modifications Proposed


3. Particle Counter Update (Geng)

Particulates in Viton