PITMinutes 08-12-2019

From CASA Wiki
Revision as of 13:04, 12 August 2019 by Krafft (Talk | contribs) (Created page with "= Attendance == R. Bachimanchi, K. Baggett, G. Ciovati, H. Fanning, C. Hovater, G. Krafft, A. Kimber, K. Macha, Ju. Musson, J. Musson, T. Plawski, T. Powers, R. Rimmer, and C...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Attendance =

R. Bachimanchi, K. Baggett, G. Ciovati, H. Fanning, C. Hovater, G. Krafft, A. Kimber, K. Macha, Ju. Musson, J. Musson, T. Plawski, T. Powers, R. Rimmer, and C. Reece.

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Low energy setup with reduced heating accomplished. Though overall month for ops but not so much SRF/RF related. Lots of difficulties with machine reproducibility, optics, etc., although some problems with separators. Seem to be moving now. 1L06 energy drain from bad control card had been limiting the current. Current limit possibly gone now.

Plan for module swaps complete.

2. In Situ Q_L Measurements (Marhauser)

Data Extraction Presentation

3. Some Comments on particulates (Geng)


Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?