PITMinutes 06-03-2019

From CASA Wiki
Revision as of 14:35, 4 June 2019 by Krafft (Talk | contribs) (Agenda and Notes)

Jump to: navigation, search

Attendance

K. Baggett, M. Bickley, P. Degtiarenko, R. Geng, C. Hovater, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, R. Nelson, and T. Powers, C. Reece, M. Spata, and S. Suhring.

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Setup for low energy physics run proceding. See item 2


2. Low energy setup (Daly, Benesch)

By varying mixing frequencies, clock eliminated as a source of noise

LLRF Transmitter

3. Particle Counter (Geng)

First version particle counter has arrived. Will attach to a mock girder beamline with valve to start evaluating particulates generated by opening/closing

4 Neutron Detectors (Degtiarenko)

Pavel got through a little under the first half of this talk. Rest two weeks from now.


Neutron Detector Description and Performance

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?