PITMinutes 09-12-2016

From CASA Wiki
Revision as of 13:04, 26 September 2016 by Krafft (Talk | contribs) (New page: == Attendance == R. Bachimanchi, G. Ciovati, A. Freyberger, C. Hovater, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer == Agenda and Notes == 1. O...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Attendance

R. Bachimanchi, G. Ciovati, A. Freyberger, C. Hovater, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Powers, T. Reilly, C. Reece, B. Rimmer

Agenda and Notes

1. Operations Status and Summary

C50-12 installed. Testing tonight Commissioning and checkout ???.

microphonics??? Tuner dampers tested Thursday: cavities 1 6 7 8 have been damped others still show fluctuations. Tested again tonight.

Field Emission and Radiation Measurements. accumulation downstream. Cavity-cavity and module to module.

Q vs. E on the NL12. Good idea to continue!

C100 He processing. NL23 improvments on field emitters. 6 FE cavities processed. Continuing.

3. C75 Mock-up Results (Gigi/Bob)

First look at data

4. Follow up Field emission Workshop (Geng)

Indigo Site available The indico web site for the followup meeting is

https://www.jlab.org/indico/event/173/

Rongli


5. LLRF Firmware Recs Summary (Rama)

LLRF FIrmware Recommendations

6. Regular Reporting

Girder Particulate Summary

Action Items