PITMinutes 08-01-2016
From CASA Wiki
Attendance
R. Bachimanchi, M. Drury, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, T. Reilly, R. Rimmer
Agenda and Notes
1. Operations Status and Summary
2. C50-12 Warm Girder Studies
3. C75 (Gigi/Bob Report Next Week)
Complete Efforts for 2 prototypes. ARD
2-3 weeks to complete mockup. 3.5 times 10 7
several HOM loads located . Gradient and load and loaded Q
low loss window loacated.
Magnetic shielding and hygeine produced good result at cavity locations in CM.
C75 or C50 next year?
4. Follow up Field emission Workshop (Geng)
Tentative Date September 12. Whole afternoon Subscribed. This room.