PITMinutes 03-28-2016
From CASA Wiki
Revision as of 12:57, 28 March 2016 by Krafft (Talk | contribs) (New page: == Attendance == R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang == Age...)
Attendance
R. Bachimanchi, S. Cooper, E. Daly, K. Davis, M. Drury, C. Hovater, R. Geng, G. Krafft, C. Mounts, C. Reece, T. Reilly, R. Rimmer, T. Plawski, T. Powers, H. Zhang
Agenda and Notes
Particulate Meeting two weeks
1. Operations Status and Summary
LERF Borrowing
Piezo work started on R100. Should be possible to
get some microphonic damping. Stay tuned, code/software
problems.
2. Heat Measurement Results (Daly)
Cabling damage is starting to be observed.
Monitor heat load changes, especially in C100s, to see if changes in material show up here. TLDs in the tunnel (end cans and warm girders)
3. C75 (Marhauser/Rimmer)
4. FE Meeting ReportR&D for improving and maintaining CEBAF gradient (Geng)