PITMinutes 03-11-2019

From CASA Wiki
Revision as of 13:16, 11 March 2019 by Krafft (Talk | contribs)

Jump to: navigation, search

Attendance

R. Bachimanchi, K. Baggett, A. Freyberger, R. Geng, C. Hotaver, G. Krafft, A. Kimber, R. Legg, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, S. Suhring, and H. Wang.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Notble event during OPS last week. Net result is gradients in two modules turned back to below onset of FE. Question to be discussed is whether all should get similar treatment.


Pre-cursors


Mount/Pwers observed many quench faults in 1L25-8 that are not quenches but are ????

1L25 and 1L26 themal cycled to 30 K in Jan. Modest Help?

Event Description


Vaccum degrades

1L25-8 becomes Unstable

valve fails

1L25-8 by-passed not recoverable

gradient loss in 1L25-7



Some startup problems have occurred. NL20 had enormous heat load even with only single cavity operating. The module will be thermal cycled and is being He processed. NL20 cavity one looks to be trashed. No valve between ion pump and cavity. Suspect pump sputtered when turned on at too high vacuum and junk now in cavity. SRF ops procedure needs to be modified as similar occurrences have occurred in the past.

NL07 also being worked on to recover performance. Looks promising. Some isolated cavities are generating vacuum trips and may need to be de-rated.

Overall goal for near term running is 1040-1060/linac

Many circulator loads failed. Started in injector and then in NLINAC after it started operating. Nothing in the SLINAC yet. Suspect the common LWC system. Could also be old age as the North is older. Troubling rate. Arne pled for focused investigation/answer.

Out of 30 kW klystron spares (for C100 cavities). Two new units on order and 3 will be sent out to be rebuilt.

2. Plasma Cleaning (Powers)

Funding approved

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?