1. Operations Status and Summary
 
1. Operations Status and Summary
 
  
 
After recovery, 1 Module exposed to air look pretty much the same
 
After recovery, 1 Module exposed to air look pretty much the same
from gradient pov.
+
from gradient point of view.
  
 
Other exposed modules being cooled down.
 
Other exposed modules being cooled down.
Line 15: Line 14:
 
Cryo on schedule for transition on Sept. 21 to two plant OPS.
 
Cryo on schedule for transition on Sept. 21 to two plant OPS.
  
4 C100s in north and 1 in injector will not be processed.
+
4 C100s in north and 1 in injector will not be He processed.
problems uncovered need to be understood. Presentations made
+
Problems uncovered in He processing C100s need to be understood.
to SRF science and analysis meeting.
+
Presentations made to SRF science and analysis meeting.
  
  

Revision as of 15:05, 31 August 2015

Attendance

S. Cooper, A. Freyberger, R. Geng, G. Krafft, F. Marhauser, T. Powers, J. Preble, T. Reilly, C. Reece, H. Wang

Agenda and Notes

1. Operations Status and Summary

After recovery, 1 Module exposed to air look pretty much the same from gradient point of view.

Other exposed modules being cooled down.

Cryo on schedule for transition on Sept. 21 to two plant OPS.

4 C100s in north and 1 in injector will not be He processed. Problems uncovered in He processing C100s need to be understood. Presentations made to SRF science and analysis meeting.


2. C75 Project Summary Document (Krafft, Freyberger)

3. SRF Budgeting for C50, C75, and R&D (McEwen, Geng)

4. C75 Power Curves (Krafft)

Action Items