Line 7: Line 7:
 
1. Operations Status and Summary
 
1. Operations Status and Summary
  
He Processing Continues.
 
  
Repaired cryo system spinning up today. Don't anticipate and delay in
+
After recovery, 1 Module exposed to air look pretty much the same
restarting beam operations presently.
+
from gradient pov.
 +
 
 +
Other exposed modules being cooled down.
 +
 
 +
Cryo on schedule for transition on Sept. 21 to two plant OPS.
 +
 
  
 
2. C75 Project Summary Document (Krafft, Freyberger)
 
2. C75 Project Summary Document (Krafft, Freyberger)

Revision as of 13:37, 31 August 2015

Attendance

R. Bachimanchi, S. Cooper, R. Geng, C. Hovater, G. Krafft, F. Marhauser, R. Michaud, C. Mounts, T. Plawski, T. Powers, C. Reece, H. Wang, H. Zhang

Agenda and Notes

1. Operations Status and Summary


After recovery, 1 Module exposed to air look pretty much the same from gradient pov.

Other exposed modules being cooled down.

Cryo on schedule for transition on Sept. 21 to two plant OPS.


2. C75 Project Summary Document (Krafft, Freyberger)

3. SRF Budgeting for C50, C75, and R&D (McEwen, Geng)

4. C75 Power Curves (Krafft)

Action Items