Difference between revisions of "PITMinutes 10-07-2019"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
Line 15: Line 15:
 
[https://casa.jlab.org/LINACPIT/HallC_FY20_reqs_benesch.pdf Hall C Run Requirements (Benesch)]
 
[https://casa.jlab.org/LINACPIT/HallC_FY20_reqs_benesch.pdf Hall C Run Requirements (Benesch)]
  
[https://casa.jlab.org/LINACPIT/fall_polariz_options.pdf Fall Polarization Options]
+
[https://casa.jlab.org/LINACPIT/fall_polariz_options.pdf Fall Polarization Options (Benesch)]
  
 
1:25      SRF Configuration after SAD  (Reilly)
 
1:25      SRF Configuration after SAD  (Reilly)

Revision as of 07:53, 4 October 2019

Attendance

R. Bachimanchi, K. Baggett, J. Benesch, E. Daly, M. Drury, C. Hovater, R. Geng, C. Ginsburg, G. Krafft, F. Marhauser, C. Mounts, T. Plawski, T. Powers, C. Reece, A. Rimmer, and A. Seryi.

Agenda and Notes

1. Extended PIT Meeting (Resumption of Operations)

1:00 Goal for Meeting (Ginsburg)

Goal for Meeting

1:10 Experiment Requirements and Desires for next running periods (HALL APLs, Grames)

Hall C Run Requirements (Benesch)

Fall Polarization Options (Benesch)

1:25 SRF Configuration after SAD (Reilly)

1:35 RF Configuration after SAD (Hovater)

1:45 Performance Expectations in Relocated Modules (Drury)

1:55 Gradient Choice at Turnon (Benesch)

2:05 Options for Pushing the Gradient (Drury)

2:25 Gradient Change Instructions for OPS (Solopova)

2:40 Energy Reach (Baggett)

2:50 CEBAF Performance Plan (Michaud)