Difference between revisions of "PITMinutes 08-12-2019"

From CASA Wiki
Jump to: navigation, search
(Created page with "= Attendance == R. Bachimanchi, K. Baggett, G. Ciovati, H. Fanning, C. Hovater, G. Krafft, A. Kimber, K. Macha, Ju. Musson, J. Musson, T. Plawski, T. Powers, R. Rimmer, and C...")
 
(Agenda and Notes)
Line 7: Line 7:
 
1. Operations Status and Summary/Review (Bickley)
 
1. Operations Status and Summary/Review (Bickley)
  
 +
Physics run extended so less time for shutdown.
 +
Good reliability running at low energy.
 +
Re-planned summer maintenance work. Rebuilt C100
 +
will go on but swap the NL07 will be put on hold.
 
Low energy setup with reduced heating accomplished.
 
Low energy setup with reduced heating accomplished.
Though overall month for ops but not so much SRF/RF
 
related. Lots of difficulties with machine reproducibility,
 
optics, etc., although some problems with separators.
 
Seem to be moving now. 1L06 energy drain from bad control
 
card had been limiting the current. Current limit possibly gone now.
 
  
 
Plan for module swaps complete.
 
Plan for module swaps complete.
Line 18: Line 17:
 
2. In Situ Q_L Measurements (Marhauser)
 
2. In Situ Q_L Measurements (Marhauser)
  
[https://casa.jlab.org/LINACPIT/JuMussonPresentation.pptx Data Extraction Presentation]
+
[https://casa.jlab.org/LINACPIT/JuMussonPresentation.pptx Presentation on Q_L Measurement]
  
 
3. Some Comments on particulates (Geng)
 
3. Some Comments on particulates (Geng)
 
 
  
 
== Action Items ==
 
== Action Items ==

Revision as of 13:07, 12 August 2019

Attendance =

R. Bachimanchi, K. Baggett, G. Ciovati, H. Fanning, C. Hovater, G. Krafft, A. Kimber, K. Macha, Ju. Musson, J. Musson, T. Plawski, T. Powers, R. Rimmer, and C. Reece.

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Physics run extended so less time for shutdown. Good reliability running at low energy. Re-planned summer maintenance work. Rebuilt C100 will go on but swap the NL07 will be put on hold. Low energy setup with reduced heating accomplished.

Plan for module swaps complete.

2. In Situ Q_L Measurements (Marhauser)

Presentation on Q_L Measurement

3. Some Comments on particulates (Geng)

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?