Difference between revisions of "PITMinutes 06-03-2019"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
 
Line 12: Line 12:
 
2. Low energy setup (Daly, Benesch)
 
2. Low energy setup (Daly, Benesch)
  
By varying mixing frequencies, clock eliminated as a source of noise
+
Gradient Distribution for Summer Run.
 +
Reduce required linac cooling to provide headroom for LERF.
  
 
[https://casa.jlab.org/LINACPIT/CEBAF_Summer_Run-Optimize_Heat_Load.pptx Heat Load Optimization]
 
[https://casa.jlab.org/LINACPIT/CEBAF_Summer_Run-Optimize_Heat_Load.pptx Heat Load Optimization]

Latest revision as of 14:39, 4 June 2019

Attendance

K. Baggett, M. Bickley, P. Degtiarenko, R. Geng, C. Hovater, G. Krafft, A. Kimber, F. Marhauser, C. Mounts, R. Nelson, and T. Powers, C. Reece, M. Spata, and S. Suhring.

Agenda and Notes

1. Operations Status and Summary/Review (Bickley)

Setup for low energy physics run proceding. See item 2

2. Low energy setup (Daly, Benesch)

Gradient Distribution for Summer Run. Reduce required linac cooling to provide headroom for LERF.

Heat Load Optimization

3. Particle Counter (Geng)

First version particle counter has arrived. Will attach to a mock girder beamline with valve to start evaluating particulates generated by opening/closing

4 Neutron Detectors (Degtiarenko)

Pavel got through a little under the first half of this talk. Rest two weeks from now.

Neutron Detector Description and Performance

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?