Difference between revisions of "PITMinutes 09-04-2018"

From CASA Wiki
Jump to: navigation, search
(Agenda and Notes)
(Agenda and Notes)
Line 22: Line 22:
 
2. CEBAF Turnon Status (Solopova)
 
2. CEBAF Turnon Status (Solopova)
  
[https://casa.jlab.org/LINACPIT/C100status_8-30-2018.pptx C100 Status at Before Vacuum Troubles]
+
[https://casa.jlab.org/LINACPIT/C100status_8-30-18.pptx C100 Status Before Vacuum Troubles]
  
 
3. Recent Microphonics Measurements (Powers)
 
3. Recent Microphonics Measurements (Powers)

Revision as of 09:15, 4 September 2018

Attendance

R. Bachimanchi, J. Benesch, M. Drury, A. Freyberger, R. Geng, C. Hovater, A. Hutton, G. Krafft, A. Kimber, C. Mounts, R. Nelson, T. Plawski, T. Powers, C. Reece, R. Rimmer, A. Seryi, and A. Solopova.

Agenda and Notes

1. Operations Status and Summary/Review (Freyberger)

Multipass beam reestablished in preparation for the physics run. In the middle of last week beam to Hall C and CW checks were initiated. Beam energy of 1050/linac was achieved with fairly reasonable trip rates as the RF recoved (see 2.)

Toward the end of last week vacuum issues, especially in the north linac SRF, necessitated halting of beam delivery to physics. Investigations of leaks continuing.

RF Heat and Q0 balancing are probably not in balance. Any Update?

2. CEBAF Turnon Status (Solopova)

C100 Status Before Vacuum Troubles

3. Recent Microphonics Measurements (Powers)

C100 System Improvement Discussion

Items Request Email

C100 Refurbishment Brainstorming List

Tony's C100 Refurbishment Brainstorming ppt

4. Beam Pulsing for JLEIC (Guo)

C100 System Improvement Discussion

Items Request Email

C100 Refurbishment Brainstorming List

Tony's C100 Refurbishment Brainstorming ppt

Action Items

Leadership of quenches. Offline discussion.

C100 Refurbishment Project for the future?